2SD718 / TRANSISTOR / TO3P / LONG LEADS / 2 PIECES (qzty)

KEC

(No reviews yet) Write a Review
$14.50
SKU:
283871974568
UPC:
Does not apply
Adding to cart… The item has been added

Product Overview

This listing is for two (2) pieces of a transistor 2SD718 in a TO3P package with long leads. These parts are new old stock and are unused. 

We may have various production codes available for this part so it is possible that your codes will be different from those pictured.

We sell ONLY new and unused parts.  We photograph actual parts from our inventory.

All parts are warrantied from date of receipt. Our maximum liability is the replacement cost of the part. Please notify seller before returning the item.  Buyer is responsible for return shipping costs.

Quantities listed may not reflect our actual stock available but rather reflect our listing limits on ebay unless otherwise noted.

Our ebay store name, "wehavethatitem" tells our story. We have more than 32,000 different IC and transistor numbers in our vast stock as well as many other items (caps, resistors, diodes, replacement flybacks, fuses, belts,  etc.).  While no one can have everything, if we do not list it,  please ask!

If there is an item that you are looking for which we do not list, please contact us, we will check our stock, quote you and then list the item for you.  Or, if there is a larger or smaller quantity of an item we list that you are interested in, contact us and we will quote you and list the item for you.

To quickly see what we have listed on ebay type in, "qzty" in the search area and our listings will appear or visit our ebay store.  We are constantly adding to our posted inventory.

Thank you.  We hope that you will "visit" us again!

wehavethatitem

Reviews

(No reviews yet) Write a Review